To the central content area

Revision to the Hazardous Waste Identification Rule and the Methods and Facilities Standards for the Storage, Clearnace and Disposal of Industrial Waste

Absrtact
This project, aiming to the modification of the recognition standards of industrial hazardous wastes and the methods and facilities standards for the storage, clearance and disposal of industrial waste, has hosted more then 30 explanation meetings in large and small scale and has preliminarily collected the opinions of the attendants from industries. The important modifications of standards include: 1.A new check to the control list of industrial hazardous waste in manufacturing process, the control list of the mixed hardware wastes and the control items of test of toxic characteristic leaching procedure (TCLP). The increase of content, word correction, and order adjustment of each key items are also completed and have been communicated with industry in the final meeting of explanation. 2.A new check of the control shortage of the existing facility standards and the completion of new articles, word correction, and the build-up of the each entrance standards of a sanitary landfill. This result of standard modification will lead to the set-up the control standard of industrial waste three year later, which are adopted from the control standard of a sanitary landfill. Moreover, this control standard is expected to enhance the intermediate treatment effectiveness to promote zero industrial waste in the future. 3.Completion of the study of the buffer articles of overall control and the companion measures, consideration of the change of industry waste code and the evaluation of the industrial waste clear-up proposal and the factors of facility change of the industrial waste storage facility. It is suggested the buffer period to be one year as a favorable condition for industries to response.
Keyword
Industrial Waste,Cleanup,Identification Standard,Revision
Open
top